DISASTER  PREPAREDNESS – ARMVs / ARTs

(Chapter – 3)

 

3.1        ACCIDENT RELIEF MEDICAL VAN (ARMV)

3.1.1        ARMV Scale-I – Equipment stored in Spl. Medical Relief Vans stabled in separate sidings

                                       i.      Location of ARME Scale-I are given below in 3.2 (b).

                                      ii.      One key of the Van is available with the SSE(C&W) or Station Master in a glass fronted case.

                                    iii.      Other key is with the doctor in charge of the ARMV.

                                   iv.      Medicines and equipments are provided as per Rly. Board norms.

                                     v.      Keys of all locks inside the ARMV are also in duplicate.  One set of keys is kept with the medical officer in charge of ARMV and the other set of keys are kept in a glass fronted case inside the ARMV.

                                   vi.      The target time for turning out of ARMV is 15 minutes by day and 20 minutes by night from the time of sounding of Hooter.

 

3.2        LOCATION OF ART AND ARME & BREAKDOWN CRANE

3.2.1         Location of ARTs over ECoR

Divn

Location

Class

Facilities Available

KUR

 

KUR

‘A’

140 T Diesel Break Down Crane (1987) with Lukas Hydraulic Re-railing equipment (1997).  3 coach SP-ART (RCF) with Lukas equipment (2000).

BHC

‘B’

With Lukas Hydraulic Re-railing equipment (2003)

TLHR

‘B’

With Lukas Hydraulic Re-railing equipment (2003)

PSA

‘B’

With Lukas Hydraulic Re-railing equipment (2003)

SBP

KBJ

‘A’

140 T Diesel Breakdown Crane(2001) with Lukas hydraulic re-railing equipment (2000).  Speed potential of modified 140 T Diesel crane is 90 KMPH.

SBP

“A’

‘A’ class with high speed (100 KMPH) 140 T crane along with 3 coach SP-ARMV (RCF) with Lukas equipment (2003).

WAT

VSKP

‘A’

‘A’ class with high speed (100 KMPH) 140 T 120 low crane along with 3 coach SP-ARMV (RCF) wit Lukas equipment (1998).

RGDA

‘A’

120 T Diesel Breakdown Crane (8/2002) with single acting Lukas equipment.

KRPU

‘B’

Lukas Hydraulic Re-railing equipment (2003) with ARME.

KRDL

‘B’

120 T Diesel breakdowns Crane (1970). With Lukas Hydraulic Retailing Equipment. 

 

3.2.2        Accident Relief Medical Equipment over ECoR

Divn

Location

Scale

Facilities Available

VSKP

VSKP

Scale-I

3 coach SP-ARMV (ICF) With 2 sets of HRD equipments (BAHCO: 1987, Holmatro: 2002)

KRPU

Scale-I

With BAHCO HRD equipments(1998).

VZM

Scale-II

 

NWP

Scale-II

 

RGDA

Scale-II

 

ARK

Scale-II

 

KRDL

Scale-II

 

JDB

Scale-II

 

KUR

KUR

Scale-I

3 coach SP- ARMV With Lukas HRD equipment (2003)

PSA

Scale-I

with BAHCO HRD  equipments(2001)

BHC

Scale-I

with Lukas  HRD equipments (2001)

CTC

Scale-II

 

BAM

Scale-II

 

TLHR

Scale-II

 

SBP

SBP

Scale-I

3 coach SP-ARMV with Lukas HRD equipment(2003)

KBJ

Scale-I

With BAHCO HRD equipment (1990)

BLGR

Scale-II

 

MSMD

Scale-II

 

TIG

Scale-II

 

                   Note:  POMKA-Available in all health units and Hospitals of  ECoR.

 

 

3.3        Position of ART/ARMEs in Neighbouring Division/RAIlWAys

3.3.1         ARTs

                                i.      S E  Railway

Sn

Station/Div.

Class

Facilities

1

BNDM/CKP

‘A’

140 T Diesel Crane with Lukas Hydraulic Re-railing equipment.

2

JSG/CKP

‘B’

Self-Propelled ART with LUKAS Hydraulic Re-railing Equipment.

3

KGP/KGP

‘A’

140 T Diesel Crane with Re-railing equipment.

                               ii.      S E C  Railway

Sn

Station/Div.

Class

Facilities

1

BIA/R

‘A’

ART with MFD & 140 T Diesel Crane.

2

BSP/BSP

‘A’

ART with Re-railing equipment & 140 T Diesel Crane.

 

 

3.3.2       ARMEs

S. E. Railway

 

S. E. C. Railway

 

S. C. Railway

Station/Div.

Class

 

Station/Div.

Class

 

Station/Div.

Class

BNDM/CKP

Scale–I

 

BIA/R

Scale-I

 

RJY / BZA

Scale-I

KGP/KGP