 |
|
|
 |
 |
 |
|
|
|
|
 |
| |
| |
| |
| Page 1 of 15
|
|
 |
| Sl.No. |
Tender Title |
Corrigendum |
Cost in Rs. |
Date of Opening |
| 1. |
Provision of supplying vegetarian & non-vegetarian diet to Indoor patient in Divnl. Railway Hospital Sambalpur. |
|
4,40,168/- |
November 25, 2008 |
| 2. |
Construction of one 02 bedded AC retiring room and one 06 bedded AC dormitory connecting proposed GRP station on the 1st floor, renovation of existing retiring room and dormitory at Sambalpur station. |
|
18,91,660/- |
November 20, 2008 |
| 3. |
Deep screening & lifting of track in patches between Rairakhol – Angul section under the jurisdiction of ADEN/Rairakhol. |
|
36,62,488/- |
November 20, 2008 |
| 4. |
Deep screening & lifting of track in patches between Sambalpur – Rairakhol section under the jurisdiction of ADEN/Rairakhol. |
|
23,19,887/- |
November 20, 2008 |
| 5. |
Execution of all civil works in connection with upgradation of 08 Nos of Manned level crossings (at Km. 5/14, 15/12, 52/9, 104/9-10, 115/15-116/1, 145/12-13, 285/10-11 & 308/2-3 ) in Raipur –Theruvali section of Sambalpur Division. |
|
18,04,022/- |
November 20, 2008 |
| 6. |
Execution of civil & Permanent Way work including supply & spreading of 340 cum of machine Crushed track ballast in connection with development of goods terminal facilities at Kantabanji to handle full block rake in two spurs by extending existing goods siding and ballast siding. |
|
16,31,287/- |
November 20, 2008 |
| 7. |
Improvement & widening of level crossings as per widened roads at both approaches in Sambalpur-Rairakhol section of Sambalpur Division. |
|
69,40,635/- |
November 20, 2008 |
| 8. |
Provision of Automatic Banner Flag at Engineering Manned Level Crossings in Bargarh Road – Titlagarh section of Sambalpur Division. |
|
8,47,000/- |
November 20, 2008 |
| 9. |
Provision of Automatic Banner Flag at Engineering Manned Level Crossings in Sambalpur – Angul section of Sambalpur Division. |
|
3,08,000/- |
November 20, 2008 |
| 10. |
Provision of concrete benches of 150 Nos and mini polycarbonate sheet PF shelters at different stations in Raipur –Theruvali section of Sambalpur Division. |
|
46,80,029/- |
November 20, 2008 |
| 11. |
Provision of concrete benches of 150 Nos. and mini polycarbonate sheet Platform shelter at different stations in Jharsuguda – Titlagarh & Sambalpur - Angul section of Sambalpur Division. |
|
46,80,518/- |
November 20, 2008 |
| 12. |
Provision of one deep tube well 200mm Dia 200 mtr deep (aprox) including pump house at Kantabanji station of Sambalpur Division. |
|
6,83,342/- |
November 20, 2008 |
| 13. |
Provision of one deep tube well 200mm dia 200 mtr. deep (approximate) including pump house at Manewsar station of Sambalpur Division. |
|
9,75,104/- |
November 20, 2008 |
| 14. |
Replacement of old tiled roof with AC sheet in staff quarters at Kantabanji station of Sambalpur Division. |
|
36,90,805/- |
November 20, 2008 |
| 15. |
Supply & Spreading of 1500 cum of Machine Crushed track ballast (as per RDSO’s specifications Jan’1999, correction slips 1&2) at Lakhna Station Yard in Raipur(Ex) – Titlagarh(Ex) section of Sambalpur Division. (Risk & Cost) |
|
8,85,000/- |
November 20, 2008 |
| 16. |
Supply & installation of 03 Nos. Electro-chlorination systems at Charmal, Bamur & Boinda stations of Sambalpur Division. |
|
7,98,813/- |
November 20, 2008 |
| 17. |
Supply & installation of 03 Nos. Electro-chlorination systems at Dungripali, Deogaon Road & Badmal stations of Sambalpur Division. |
|
7,98,813/- |
November 20, 2008 |
| 18. |
Supply delivery, stacking & loading of 38,000 cum of Machine Crushed track ballast (as per RDSO’s specifications June’2004, correction slips 1&2) at Maneswar Depot of Sambalpur Division |
|
2,52,00,202/- |
November 20, 2008 |
| 19. |
Supply of 4304 Nos 60 Kg 90 UTS and 2023 Nos. 52 Kg 90 UTS Allumino Thermit welding portions, prefabricated moulds with all allied materials, consumable equipments etc. including welding with supervision and certified welders from RDSO/Lucknow for various Permanent Way works in Jharsuguda-Titlagarh & Sambalpur-Angul section of Sambalpur Division |
|
75,15,371/- |
November 20, 2008 |
| 20. |
Upgradation of 4 Nos of manned Level Crossings in Jharsuguda(Ex) –Titlagarh(Ex) section of Sambalpur Division. |
|
9,14,539/- |
November 20, 2008 |
| 21. |
Replacement of existing signaling gears and Provision of all SandT works for commissioning of Panel Interlocking at Bacheli-Dantewara and Kirandul stations on Kottavalasa–Kirandul section in WALTAIR division of East Coast Railway. |
|
Rs 2,23,74,614/- |
November 19, 2008 |
| 22. |
Signalling portion of work inconnection with provision of additional loop at Manabar , Chatriput, Kumarsodhra , Dabpal , Amagura , Tokopal and provision of sand hump at Gidam of K.K.Line of Waltair Division |
|
13454932 |
November 19, 2008 |
| 23. |
Maintenance of 40 bedded new running room at BBS including providing subsidized meal for a period of two years. |
|
3416140 |
November 18, 2008 |
| 24. |
Naupada –Gunpur Gauge Conversion Project:- Execution of balance Precast RCC boxes and connected works including transportation, launching & jointing at the bridge sites as per Railway’s drawings in between K.M.47 to K.M.90. |
|
2,03,17,275 |
November 18, 2008 |
| 25. |
Naupada –Gunpur Gauge Conversion Project:- Execution of civil works for level crossing like gate goomties, station buildings, approach roads with C.C/Black top surfacing ,providing lifting barriers and other Misc. works, etc in between K.M.47 to K.M.90. |
|
2,00,04,058 |
November 18, 2008 |
 |
| Page 1 of 15
|
|
|
| |
|
|
 |
|